EUROTECH Vacuum Technologies
한국어

New Zealand H1 Glazing Requirements for IGU

New Zealand H1 Glazing Requirements: What They Mean for IGU Manufacturing

For an IGU manufacturer, “H1-compliant glazing” is the start of a specification discussion. It does not yet identify the panes that a production line will handle.

The factory still needs the glass build-up, coating, dimensions and processing requirements. The equipment supplier needs to know which of those panes—or which completed unit—is being picked up, positioned or transferred. Keeping those stages separate prevents a building-performance requirement from becoming an incomplete suction-cup specification.

Regulatory sources checked on 5 November 2026. Confirm the applicable edition and compliance route for the individual project with its responsible designer.

Browse glass manufacturing and handling guides

H1 specifies performance, not a nationwide pane count

New Zealand’s Building Code H1 addresses energy efficiency. Its compliance documents should not be summarized as a blanket instruction to use double glazing or triple glazing in every building.

Insulating glass may form part of a suitable window and building design. The number of panes alone, however, does not establish the performance of the complete window. Glass, frame, edge construction and the design route all need to be considered by the party responsible for compliance.

Identify the edition, building and compliance route

MBIE’s 2025 Building Code update introduced revised H1/AS1, H1/AS2, H1/VM1 and H1/VM2 documents on 27 November 2025 and sets 26 November 2026 as the end of the transition from the previous editions. MBIE describes the overall energy-efficiency and insulation level as unchanged; the update includes changes to how compliance is demonstrated.

Questions to resolve before quoting a glazing performance requirement
QuestionWhy it matters
Which building?H1/AS1 and H1/VM1 cover housing, and non-housing buildings up to 300 m², subject to their scope conditions. Larger non-housing buildings use different documents, including H1/AS2 and H1/VM2.
Which route?Acceptable Solutions and Verification Methods are recognized routes to demonstrate compliance, not product specifications for suction cups or glass factories.
Which location?The applicable climate zone affects the performance assessment. New Zealand has six H1 climate zones.
Which project date?Use the edition accepted for the relevant application and transition conditions, rather than a value copied from an undated article.
New work or existing building?Repairs, replacements and extensions need their own scope assessment.

The sixth edition of H1/AS1 covers housing of any size, and other buildings with an occupied floor area no greater than 300 m², subject to its scope conditions. Its calculation method includes limits such as the glazing-area criterion; a project outside that route needs another appropriate compliance approach. A table of reference-building values should not be presented as a universal minimum for every individual window.

For existing buildings, MBIE’s repair and replacement guidance distinguishes small changes from more extensive work. A small window replacement is not automatically an instruction to upgrade every existing window to a new-build specification.

Keep Ug, Uw and window R-values separate

Thermal figures describe different parts of the specification
FigureWhat it describesWhat to check
UgThe thermal transmittance of the glazing.Do not substitute it for a complete window value.
UwThe thermal transmittance of the complete window.Identify the window construction, dimensions and applicable calculation or test basis.
Window R-valueThermal resistance of the relevant window construction.Only use a reciprocal conversion with a corresponding U-value, consistent units and the same definition.

A handling supplier should not reverse-engineer a glass build-up from one thermal figure. Ask for the actual product and drawing approved for manufacture. Record whether a number belongs to the glazing, the complete window or the building calculation.

Translate the approved build-up into a production workpiece

Two orders can have the same overall dimensions but use different panes, coatings or laminated components. The handling review follows those physical differences.

The information handover from specification to handling
Responsible inputInformation to pass on
Project designer / window-system supplierRequired performance, applicable route, window-system definition and approved glazing specification.
Glass supplier / IGU processorExact glass products, pane thicknesses, coating positions, heat-treatment and laminate details, dimensions and mass.
Machine or handling-system reviewStation, actual workpiece at that station, permitted contact area, supports, movement, mounting and release conditions.

For example, a loading station may handle an individual coated pane that later faces a sealed cavity. A downstream transfer may handle the completed IGU from an accessible outer surface. Those are different contact and load conditions, even though both operations belong to the same order.

Where a design uses three panes, read the guide to conventional and thin-center-pane triple IGUs. The completed unit’s pane count does not describe the stiffness or mass of each workpiece passing through the line.

Review the contact surface before selecting a cup or cover

Use the glass manufacturer’s processing instructions to establish the permitted contact face. Where the selected product restricts coating contact, the solution must begin with those restrictions. A generic “non-marking” description or the addition of a cover does not establish compatibility.

The existing Low-E contact and surface-protection guide explains how to connect the glass product, contact path and inspection record. For component options, continue to suction cups for insulating-glass production lines or the industrial glass suction-cup range.

A compliance-document change is a reason to reconfirm incoming specifications. It does not necessarily mean that every order needs a new glass build-up or different handling equipment. Decisions about production capacity also need order and investment evidence; H1 alone cannot establish a glass-industry growth rate.

Prepare an enquiry that an equipment supplier can assess

Send the pane or IGU drawing, exact glass product and coating, dimensions and confirmed mass. Add the machine model, production station, available contact face and required movement. For replacement cups, include the existing reference, mounting details and photographs.

EUROTECH can then discuss candidate vacuum components or the relevant handling application. Building and window compliance remains with the responsible design and supply parties; a vacuum component does not certify an H1-compliant window.

Request an IGU handling or replacement-cup review

Official references

Engineering Quote List (RFQ)

Consolidate SKUs, materials & quantities for fast B2B quotation

Your Quote List is Empty

Browse the EUROTECH e-catalog or parametric SKU finder and click Add RFQ on any suction cup, MTC cover, or component.